Load test

Phase of a project in which the installation is subjected to real operation before acceptance. It concentrates a large part of the claims during the period.

In practice

The all-risk construction limits its duration —often four weeks— and for used equipment usually excludes it. In industrial projects, it is advisable to negotiate it before setting the commissioning schedule.