24h AssistanceClient Area
Food
Industry and product

Food

In food, underwriting is organised around the batch number, as it allows the product to be traced once it has left the plant. The contracted sub-limit determines who finances locating, recovering, and destroying it; the cost of that operation in terms of results over the following months is covered by a different guarantee, the loss of profits due to product contamination, and it is advisable to size both in the same discussion.

Where the claim enters

Batch contamination, traceability and product recall

What decides the claim file

The warehouse value varies each month of the year and the line resumes billing when the first batch is released.

Insuring a food company involves organising three decisions made months in advance: how far the withdrawal expense guarantee extends and what margin loss accompanies it, with what capital the stock is declared when the campaign peak arrives, and how many weeks separate the end of a repair from the first sellable shipment. All three are resolved at renewal, as none can be corrected once the product is already distributed.

  1. The sub-limit that finances a withdrawal

    Withdrawal expenses finance a logistical operation: notifying the distribution, locating the goods, transporting them back, and destroying them. They are covered by a sub-limit within the liability policy, and it is advisable to compare it with the cost of recovering a reference already distributed across several chains. The margin loss in the following months is covered by another guarantee, the loss of profits due to product contamination.

  2. Stock declared on an annual average

    When the average of the exercise is declared, the capital falls below the value at the peak of the campaign, which is when there is the most merchandise in the warehouse. The proportional rule of article 30 of the Insurance Contract Law also reduces partial damages.

  3. The cold chain and machinery breakdown

    Damage to stock due to temperature variation depends on a guarantee that the damage policy does not include by default: the machinery breakdown of the cooling equipment and its extension to the preserved merchandise. It is advisable to also review the minimum downtime required by the terms before acknowledging the deterioration.

  4. The trigger for the withdrawal guarantee

    Withdrawing by order of the competent authority and withdrawing by one's own decision following an analytical result are two different situations. The terms define which of them activates the cover, and that definition organises the file even before the limit.

Frequently asked questions

Lo que nos preguntan en food

Does the civil liability policy cover the withdrawal of a batch?

Civil liability responds to the damage that the product causes to a third party. Recovering it — notifying the distribution, retrieving the merchandise, transporting it, and destroying it — is compensated by the withdrawal expenses guarantee, which is contracted separately and with its own sublimit. The loss of margin in the following months belongs to a third guarantee, the loss of profits due to product contamination, and the three are dimensioned separately.

How are stocks declared if the warehouse only fills during the campaign?

On the peak of the exercise, which is when there is the most stock inside and when a capital calculated by the average falls short. To avoid maintaining that peak for twelve months, there is the periodic declaration clause: a maximum capital is set, the actual stock is declared with the agreed frequency, and the premium is regularised at the close.

Once the line is repaired, from when does the plant start billing again?

Later than the repair completion certificate indicates. Between the start-up of the equipment and the first sellable shipment are the cleaning and disinfection, the validation of the line, and the release of the first batches by quality control, and that stretch runs entirely within the indemnity period. Therefore, the period is dimensioned based on the return to the shelf, which occurs weeks after the end of the work.

Let's talk

Get in touch

A specialist reviews your programme and reports back in writing on what would change, what would stay and what each option would cost.

Request an assessmentOr drop by any of our four offices.